Projects and site records

We photograph the key stages of every job and hand the record to the client on completion. Below are before and after photos from recent projects.

Project cases

Recent projects completed by Grand Engineering, photographed by our site team. Where clients prefer not to publish an address, only the property type is shown.

01

Ceiling spalling repair in a residential flat

  • PropertyResidential flat
  • WorkConcrete repair

Several areas of the ceiling and beam soffits had spalled, leaving corroded rebar exposed. Loose concrete was broken out, the rebar was de-rusted and primed, and the section was rebuilt in layers with repair mortar before skim coating and repainting. Concrete structural repair →

Spalled ceiling with exposed, corroded rebarBefore
Spalled ceiling with exposed, corroded rebar
Spalled beam soffit above a window exposing rebarBefore
Spalled beam soffit above a window exposing rebar
Grey repair mortar patches on the ceiling after rebuildingDuring
Grey repair mortar patches on the ceiling after rebuilding
Room ceiling after repair and repaintingAfter
Room ceiling after repair and repainting
Flat ceiling and window area after repair and repaintingAfter
Flat ceiling and window area after repair and repainting
02

Exposed waterproofing on a building roof

  • PropertyResidential building roof
  • WorkRoof waterproofing

The existing roof tiles were worn and stained and no longer kept water out. After surface preparation and detailing, an exposed waterproof coating was applied across the whole roof and up the parapet base. Roof & flat-roof waterproofing →

Worn, stained roof tiles before worksBefore
Worn, stained roof tiles before works
Roof finished with a grey exposed waterproof coatingAfter
Roof finished with a grey exposed waterproof coating
Waterproof coating turned up the parapet baseAfter
Waterproof coating turned up the parapet base
03

Hotel roof waterproofing

  • PropertyHotel roof
  • WorkRoof waterproofing

The old membrane on the roof deck, parapet tops and plant room walls had aged and was peeling. The old layer was removed, joints and edges were detailed, and a new waterproof coating was applied to the deck, parapets and plant room walls. Roof & flat-roof waterproofing →

Aged, peeling roof membrane with rust stainsBefore
Aged, peeling roof membrane with rust stains
Roof plant room wall and equipment before worksBefore
Roof plant room wall and equipment before works
Parapet tops finished with grey waterproof coatingAfter
Parapet tops finished with grey waterproof coating
Plant room wall after waterproof coatingAfter
Plant room wall after waterproof coating
04

Commercial building roof, Mong Kok

  • DistrictMong Kok
  • PropertyCommercial building roof
  • WorkRoof waterproofing

Waterproof coating applied to the roof deck and parapets of a commercial building, with the parapet base and top edges detailed. Roof & flat-roof waterproofing →

Mong Kok commercial roof finished with grey waterproof coatingAfter
Mong Kok commercial roof finished with grey waterproof coating
Mong Kok commercial roof parapet after waterproof coatingAfter
Mong Kok commercial roof parapet after waterproof coating
05

Commercial building roof, Central

  • DistrictCentral
  • PropertyCommercial building roof
  • WorkRoof waterproofing

The old roof membrane on a commercial building in Central had aged and broken down. The surface was prepared and a new waterproof coating was applied, with pipe penetrations and the parapet base detailed. Roof & flat-roof waterproofing →

Aged roof membrane on a Central commercial buildingBefore
Aged roof membrane on a Central commercial building
Central commercial roof finished with light grey waterproof coatingAfter
Central commercial roof finished with light grey waterproof coating
Finished roof with pipe penetrations sealed along the edgeAfter
Finished roof with pipe penetrations sealed along the edge
06

Bathroom floor waterproofing in a flat

  • PropertyResidential flat
  • WorkIndoor floor waterproofing

Water from the bathroom floor was seeping into the flat below. A waterproof coating was applied over the floor and wall base, with extra detailing around the WC and pipes. Floor coating (epoxy / PU) →

Original bathroom floor tiles before worksBefore
Original bathroom floor tiles before works
Bathroom floor and wall base finished with grey waterproof coatingAfter
Bathroom floor and wall base finished with grey waterproof coating
07

Village house roof waterproofing

  • PropertyVillage house
  • WorkRoof waterproofing

The old roof tiles had deteriorated, with water marks around the air-conditioner base and pipes. After surface preparation and pipe detailing, a waterproof coating was applied over the whole roof. Roof & flat-roof waterproofing →

Aged village house roof tiles with water marksBefore
Aged village house roof tiles with water marks
Village house roof finished with white waterproof coatingAfter
Village house roof finished with white waterproof coating
Waterproofing finished around the air-conditioner baseAfter
Waterproofing finished around the air-conditioner base
08

Detached house terrace, Tai Po

  • DistrictTai Po
  • PropertyDetached house
  • WorkTerrace waterproofing

The terrace and balcony tiles had aged, with dirt in the joints. A waterproof coating was applied over the floor and wall base, including the planter area. Roof & flat-roof waterproofing →

Tai Po house terrace tiles before worksBefore
Tai Po house terrace tiles before works
Aged balcony tile jointsBefore
Aged balcony tile joints
Terrace finished with white waterproof coating, including the planter areaAfter
Terrace finished with white waterproof coating, including the planter area
Balcony floor and wall base after waterproof coatingAfter
Balcony floor and wall base after waterproof coating
09

Window frame re-sealing

  • PropertyResidential
  • WorkExternal wall waterproofing

The old sealant between the window frame and external wall had failed, letting rain into the room. The old sealant was removed, the edges were masked, and new sealant was applied. External wall waterproofing →

Window frame masked ready for new sealantDuring
Window frame masked ready for new sealant
Window frame after re-sealingAfter
Window frame after re-sealing

More site records

200+
Concrete repair jobs
180+
Waterproofing and leak repair jobs
100+
Demolition and reinstatement jobs