02 · FLOOR

Floor coating (epoxy and PU floors)

For car parks, industrial buildings, warehouses, factories, rear staircases, common corridors and roofs. We select the coating system to suit traffic, loading, slip resistance and outdoor exposure.

Indoor car park with grey epoxy floor coating and yellow lane markings (illustration)
Epoxy floor finish (illustration)

What is the difference between epoxy and PU floors?

Epoxy floors are hard, abrasion-resistant and chemical-resistant, which suits indoor car parks, factories and warehouses, but they yellow under prolonged sunlight. Polyurethane (PU) floors are more flexible and UV-resistant, so they suit outdoor areas, roofs and locations that also need waterproofing. We recommend a system based on use, substrate condition and budget.

Common signs

  • Dusting, sanding or peeling paint
  • Cracked or uneven floor
  • Slippery car park floors or ramps
  • Floors damaged by oil or chemicals
  • Lane markings or zones need repainting

Method statement

  1. Site surveyCheck substrate strength, moisture, cracks and existing coatings, and measure the area.
  2. Surface grindingRemove laitance, old coatings and contamination to improve adhesion.
  3. Vacuum cleaningRemove all grinding dust.
  4. Crack and hollow repairFill cracks and pits and treat movement joints.
  5. PrimerPenetrates the substrate to strengthen the bond.
  6. Intermediate coat or screedBuild thickness or level the floor; quartz sand can be added for wear resistance.
  7. Top coatApply to the specified thickness, with anti-slip aggregate where needed.
  8. Line marking and curingMark bays, lanes or safety zones, then cure as required before reopening.

Systems and materials

SystemTypical use
Epoxy thin coatIndoor storage, plant rooms, corridors; light to medium use
Epoxy self-levellingSmooth, easy-clean workshops and clean areas
Epoxy anti-slipCar parks, ramps and rear staircases
PU floor or PU waterproof top coatOutdoor areas, roofs and flat roofs needing flexible waterproofing

We commonly use Nippon and Sika products. The final system depends on use, substrate and budget, and is stated in the quotation.

Testing and records

  • Visual and thickness check
  • Slip-resistance check where specified
  • Curing and reopening times agreed before work starts
  • Photo record
  • Warranty typically 1–3 years, stated in the quotation according to system and scope

Information we need for a quote

  • Location and use (car park, factory, warehouse, etc.)
  • Approximate area
  • Photos of the existing floor
  • Whether work must be phased to keep operations running

FAQ

How long will the area be out of use?

It depends on the material and area; time is needed for grinding, coating and curing. Where operations must continue, we can phase the work or work outside business hours, as agreed in the quotation.

Does all old paint have to be removed?

If the old coating is peeling or poorly bonded, it must be ground off. If it is sound, it can be ground and recoated. We assess this during the survey.

Is epoxy suitable for an outdoor roof?

Epoxy yellows and chalks under prolonged UV exposure. For outdoor areas we generally recommend PU or a dedicated exterior finish.

Can the floor be made slip-resistant?

Yes. Anti-slip aggregate can be added to the top coat for ramps, staircases and wet areas.

How long is the warranty for floor coating?

Our warranty for floor coating is typically 1–3 years. The exact period depends on the system, materials and scope, and the warranty terms are stated in the quotation.

Survey first, then quote

Send us photos or a short video. We will reply with an initial view and arrange a free site survey.