Roof and wall waterproofing
and concrete repair in Hong Kong
Grand Engineering carries out waterproofing and repair works for residential buildings, village houses, shops and industrial buildings. We trace the source of the leak first, then issue a written quotation listing method, materials and programme. Every job is verified with a ponding or water spray test and handed over with a photo record.

No.MWC 90/2019
- MWC 90/2019Buildings Department registration
- Class I, II, IIIMinor works classes
- Gov. seepage listListed registered contractor
- Nippon, SikaMain material brands
Who is Grand Engineering?
Grand Engineering (創巍工程) is a local contractor based in Cheung Sha Wan, Kowloon. It is a Buildings Department Registered Minor Works Contractor, registration no. MWC 90/2019, for Class I, II and III and Types A, B, D, E, F and G minor works, and appears on the registered contractor list published by the Joint Office for Investigation of Water Seepage Complaints. Its core works are roof and flat-roof waterproofing, floor coating, external wall waterproofing and concrete structural repair for owners, owners' corporations and property managers. Typical warranty periods range from 1 to 10 years by type of work and are stated in the quotation.
Four core trades
Every job starts with a survey, follows a method suited to the site and ends with testing and a photo record.

Roof & flat-roof waterproofing
Trace the leak source, treat cracks, drains and pipe penetrations, re-lay the membrane and verify with a ponding test.
Learn more
Floor coating (epoxy / PU)
Car parks, industrial buildings, warehouses and roofs: grind, repair cracks and apply a hard-wearing, anti-slip or waterproof finish.
Learn more
External wall waterproofing
Leaks through wall cracks, window frames and penetrations: crack injection, re-sealing and waterproof coatings, verified by water spray test.
Learn more
Concrete structural repair
Spalling, exposed rebar and cracks: break out loose concrete, treat corroded steel and rebuild with repair mortar in layers.
Learn moreOther services: water seepage investigation, Buildings Department orders, demolition and reinstatement, minor works. Other services →
Cumulative completed jobs (Grand Engineering internal records)
How we control quality
Source first
We do not rush a quote before the cause is clear. Surveys include measurement, photos and infrared thermography where useful.
Written quotation
Scope, method, materials, programme and payment terms are set out clearly for owners and owners' corporations.
Tested handover
Waterproofing is verified with ponding or water spray tests before finishes go on.
Photos and documents
Key stages are photographed; minor works submissions are made as required.
From enquiry to handover in five steps
WhatsApp enquiry
Send the address, building age, photos or video of the problem and your timing.
Initial assessment
We clarify scope, such as spalling area, waterproofing location or signs of seepage.
Site survey
On-site measurement, photos and risk assessment to confirm feasibility.
Proposal and quotation
Method, programme and payment terms, including any compliance requirements.
Works and handover
Works and testing as proposed, site clearance and photo record.
Recent projects
Common questions from owners and OCs
Is Grand Engineering a registered contractor?
Yes. Grand Engineering is a Buildings Department Class I Registered Minor Works Contractor, registration no. MWC 90/2019, for Class I, II, III and Types A, B, D, E, F, G minor works, and is listed by the water seepage Joint Office.
Is the site survey free?
Yes, site surveys are free. Afterwards we provide a written quotation stating scope, method, materials, programme and payment terms.
Is there a warranty?
Yes. Typical warranty periods are 3–10 years for roof and flat-roof waterproofing, 1–3 years for floor coating, 1–5 years for external wall waterproofing and 1 year for concrete repair. The exact period depends on the system, materials and scope, and is stated in the quotation.
Does a leaking roof always need full re-waterproofing?
Not always. If the membrane is largely sound and only isolated cracks or drains have failed, local repair may be enough. If the membrane is generally aged, blistered or leaking in many places, full re-membraning is usually more cost-effective. A site survey is needed to decide.
Can spalling just be plastered over?
No. If the corroded steel is not treated, it keeps rusting and expanding, and the patch will crack again soon.
Survey first, then quote
Send us photos or a short video. We will reply with an initial view and arrange a free site survey.












